Lohan & Donnelly Consulting Engineers were delighted to be involved in the Temporary Works required to safely move the Beaver Row Footbridge onto a Low Loader for transportation to a workshop for renovation & refurbishment works. The bridge was constructed in approximately 1880 and is listed as a protected structure.

