Structure now topped out on Airton Plaza on both Blocks. The 328 unit apartment development is on program and due for completion January 2025.
The structure consists of a Post Tension RC slab at ground floor, part first floor and part second floor. Walls are RC/mass concrete with precast wide slab floor plates in general.